Case Study
Home Âŧ Case Study Âŧ Page 3
With GLSS, this manufacturer increased throughput from 67 boxes per hour to an average of 92.8 boxes per hourâa 38% improvement.
With GLSS, this healthcare system increased first case on-time starts from 39% to 60%âa 54% improvement that enhanced patient satisfaction and reduced staff strain.
With GLSS, the average experiment cycle time dropped from 130 minutes to approximately 100 minutesâa 23% reduction in cycle time.
With GLSS, this manufacturer improved their on-time completion rate from 35% to 90%âa 157% improvement.
With GLSS, this healthcare provider cut the review cycle time from an average of 40 days to just 27 daysâa 33% improvement.
With GLSS, this industrial machinery manufacturer increased its warranty claim filing rate from 43% to 62%âa 44% improvement.
With GLSS, this manufacturer increased production output from 44 parts to 64 parts per hour on averageâa 45% improvement.
With GLSS, this lab equipment manufacturer reduced the Return Material Authorization turnaround time from 33 to 15 daysâa 55% improvement.
With GLSS, the company reduced sales order lead time from 21 days to 14 days, achieving a 33% improvement in delivery speed and significantly increasing customer satisfaction and on-time revenue.
GLSSâs innovative designâonline, flexible, and accessibleâmade it possible for Rogers to scale training faster, deliver results quicker, and ensure a consistent, high-quality learning experience across the globe. The outcome is more than certifications; itâs a culture that continuously improves, adapts, and thrives.
No post found.
