Manufacturer
Home Âŧ Manufacturer
With GLSS, the project reduced average banding cycle time from 188 seconds to 115 seconds, a 39% improvement, helping work move through production faster and more consistently.
With GLSS, the manufacturer reduced average yoke fabrication setup time from 17.6 hours to 5.6 hours, a 68% improvement that helped reduce overtime, simplify production, and improve scheduling flexibility.
With GLSS, the organization reduced manual assembly cycle time from 8.4 seconds to 6.3 seconds, a 25% reduction in cycle time that contributed to a 33% increase in throughput and moved production closer to its target of 4,000 units per operator per shift.
With GLSS, this manufacturer reduced tape breaks from an average of 173 to 122 instances per million pounds producedâa 30% improvement in process performance.
With GLSS, the organization reduced average raw material release time from 23 minutes to 14 minutes, improving the process by approximately 39% while creating a more organized and consistent workflow.
With GLSS, this manufacturer reduced average open circuit defects from 6.5 defects per week to 1.3 defects per week, an 80% improvement in process performance and quality consistency.
With GLSS, this glass manufacturer reduced monthly picking errors from 9 to 2 â a 78% improvement in order fulfillment accuracy.
With GLSS, this food manufacturer reduced package weight variation from 36 grams to 20 grams, representing a 44% reduction in variation, and unlocked $757K in annual savings.
With GLSS, this manufacturer increased throughput from 67 boxes per hour to an average of 92.8 boxes per hourâa 38% improvement.
With GLSS, this industrial machinery manufacturer increased its warranty claim filing rate from 43% to 62%âa 44% improvement.
No post found.
